I’m still having a few issues in trying to get the driveway fixed. You can’t find an excavation contractor to come in and change the slope of the driveway before September or October.
This leaves me the choice of not taking the motorhome out of the driveway before then, or doing something else. I opted for the latter.
I figured that, if I removed the pavement from the bottom of the driveway, at least when I scrape, I’ll hit something softer rather than several inches of asphalt. This meant that I would have to rent a jackhammer and use one for the first time since I was about 17 years old.

It took a little longer than I had hoped, about 3 hours of work, but I did get the pavement out. This took longer because it was 8″ thick in some places. I suspect there has been multiple patch jobs done by simply over-paving a previous bad job. Note that in part of the area I did, the asphalt was just laid down on sand, with no gravel. It isn’t hard to guess why there may have been a multitude of patch jobs done in the years previous to us buying the lot.
That being said, the job was semi-successful. I still scrape, even with extra weight on the front by putting the storage rack in the front bumper hitch and putting my 4000 watt generator on it. However, it’s a lot nicer to just scrape in gravel than the alternative…