I started the day with three jobs to do. However, fate hath kicked me in the teeth again and each of the three are only partly done.
I wanted to finish the water system in the camper. After much cursing, swearing and expressing myself in a less than “fit for all audiences” manner, I did install the last fitting and nothing leaks. Yee hah! However, the pump for running from the water tank rather than a city water system doesn’t work. I suspect I have a minor wiring issue and will look at it tomorrow. All in all, this job is 98% done, so I was reasonably successful.
Job number 2 was wiring the trailer lights on the Escape. I had a hitch installed and ordered a factory wiring harness for it. The harness came in today and I went to plug it in and make sure it worked. It didn’t. I spent about 30 minutes tracking wiring until I discovered that the truck doesn’t come with the two fuses required for the trailer lights. I need a 15 and 20 amp mini fuse. I only managed to find the 15 amp one and have to go downtown tomorrow to get the other. This job is about 90% done, so I shouldn’t complain.
Lastly, it’s time to paint the old pickup and sell it. I don’t totally want to sell it, but having two pickups is sort of redundant. It’s a 1987 Ford F250 with a 460 cu. in. motor. It needs a bit of touch up on both sides. I picked up the paint and went to mask it but ran out of masking tape. I did, however, get one side painted and it looks nice. Oh, well. This one is 50% done I guess. However, tomorrow, the forecast is rain so I’ll either have to run a tarp over the truck or wait until a few days from now to finish this job.
So, three jobs to do and none finished. Maybe, tomorrow will be a bit more productive…
